Case study: Voith Hydro: Turbine installation study
| Client | Voith |
Mojo conducted an operational installation and O&M study for Voith Hydro which outlined a range of installation options and methods for use at EMEC and future sites. The options varied from traditional DP/moored barge installation methods through to innovative new bespoke solutions. Mojo Maritime's marine experience coupled with Mojo Ocean dynamic's simulation and analysis expertise helped to identify methods that minimised risk, expenditure and that are practically feasible. Mojo hopes to develop the new concepts further with Voith Hydro and ultimatley use them at EMEC in the near future.


+44 (0) 1326 218 218
