Case study: Pulse Tidal Installation Study

Client Pulse Tidal
Date February 2011

Mojo Maritime conducted a study with Pulse Tidal to develop sound marine operation planning for the installation of the pulse tidal generation device. The study initially identified a number of installation methods with the preferred method taken into more detail including a concise marine operations plan, project schedule, approximate costs and risk assessment. As part of the study Mojo was required to demonstrate the movement of vessels and components using CAD renderings and animations which where backed by extensive marine operation experience and hydrodynamic analysis.